hidden pixel

European Remote-sensing Satellite Information

European remote sensing satellite (ERS) was the European Space Agency's first Earth-observing satellite. It was launched on July 17, 1991 into a Sun-synchronous polar orbit at a height of 782–785 km.

Contents

Instruments

ERS-1 carried an array of earth-observation instruments that gathered information about the Earth (land, water, ice and atmosphere) using a variety of measurement principles. These included:

To accurately determine its orbit, the satellite included the PRARE (Precision Range and Range-Rate Equipment) and a Laser Retroreflector. The PRARE was non-operational since launch. The Retroreflector was used for calibrating the Radar Altimeter to within 10 cm.

Mission

ERS-1 had various mission phases using 3-day, 35-day and a 336-day repeat cycle. The 336-day mission (Geodetic Mission) allowed for accurate mapping of the Earth's bathymetry and geoid over the seas using the Radar Altimeter.

ERS-1 failed on March 10, 2000, far exceeding its expected lifespan.

ERS-2

Its successor, ERS-2, was launched on April 21, 1995, on an Ariane 4, from ESA's Guiana Space Centre near Kourou, French Guiana. Largely identical to ERS-1, it added additional instruments and included improvements to existing instruments including:

When ERS-2 was launched, ERS-1 shared the same orbital plane. This allowed a tandem mission, with ERS-2 passing the same point on the ground 1 day later than ERS-1. ERS-2 has a repeat cycle of 35 days.

ERS-2 has been operating without gyroscopes since February 2001, resulting in some degradation of the data provided by the instruments. The tape drive aboard failed on June 22, 2003, leaving the instruments operating only within visibility of a ground station. Since the tape drive failure additional ground stations have been brought online to increase the data gathering abilities of the satellite. The Wind Scatterometer and GOME were the only instruments of their kind until the launch of MetOp-A.

The successor to ERS-2 is Envisat containing improved versions of many of the instruments onboard ERS-2; however, its operational life was increased until 2011. Over a series of burns in July, August and September, ERS-2 was finally depleted of all fuel on September 5, 2011. At 13:16:38 the batteries were switched off, leaving the spacecraft in an orbit where it will reenter the Earth's atmosphere and safely disintegrate within 25 years according to international standards.

In the final stages of emptying the fuel tanks, it was estimated that they would be empty after a 40 minute burn on 2 September 2011. However, the spacecraft survived both this manouvre and a second 40 minute burn on the 3rd of September. On the 5th of September a third burn was initiated and the fuel tanks were finally drained.

References

This article does not cite any references or sources. Please help improve this article by adding citations to reliable sources. Unsourced material may be and removed. (June 2009)

External links

Orbital meteorological and remote sensing systems
Concepts
Current projects
Earth Observing System (EOS)
A-train satellites
Other satellites
Former projects
Completed
Failed
European Space Agency
Spaceports
Launch vehicles
Facilities
Communications
Programmes
Predecessors
Related
Projects
Science
Solar Physics
Planetary Science
Astronomy and cosmology
Earth observation
Human spaceflight
Telecommunications
Technology Demontrators
Cancelled
Failed

Categories:

 

The above information uses material from Wikipedia and is licensed under the GNU Free Documentation License.
Some facts may not have been fully verified for accuracy. [Disclaimers]
This page was last archived by our server on Fri Apr 6 16:31:20 2012.
Displaying this page or its contents does not use any Wikimedia Foundation's resources.
The owners of this site proudly support the Wikimedia Foundation.